Determination of concession period in build-operate-transfer projects using fuzzy logic

Nasirzadeh, Farnad, Khanzadi, Mostafa and Alipour, Majid 2014, Determination of concession period in build-operate-transfer projects using fuzzy logic, Iranian journal of management studies, vol. 7, no. 2, Summer, pp. 437-456, doi: 10.22059/ijms.2014.36625.

Attached Files
Name Description MIMEType Size Downloads

Title Determination of concession period in build-operate-transfer projects using fuzzy logic
Author(s) Nasirzadeh, Farnad
Khanzadi, Mostafa
Alipour, Majid
Journal name Iranian journal of management studies
Volume number 7
Issue number 2
Season Summer
Start page 437
End page 456
Total pages 20
Publisher University of Tehran
Place of publication Tehran, Iran
Publication date 2014-07
ISSN 2008-7055
Keyword(s) BOT
concession period
fuzzy logic
risk management
Language eng
DOI 10.22059/ijms.2014.36625
HERDC Research category C1.1 Refereed article in a scholarly journal
ERA Research output type C Journal article
Copyright notice ©[2014, University of Tehran]
Persistent URL http://hdl.handle.net/10536/DRO/DU:30106475

Document type: Journal Article
Collection: School of Architecture and Built Environment
Connect to link resolver
 
Unless expressly stated otherwise, the copyright for items in DRO is owned by the author, with all rights reserved.

Versions
Version Filter Type
Citation counts: TR Web of Science Citation Count  Cited 0 times in TR Web of Science
Scopus Citation Count Cited 0 times in Scopus
Google Scholar Search Google Scholar
Access Statistics: 32 Abstract Views, 2 File Downloads  -  Detailed Statistics
Created: Thu, 22 Feb 2018, 11:43:54 EST

Every reasonable effort has been made to ensure that permission has been obtained for items included in DRO. If you believe that your rights have been infringed by this repository, please contact drosupport@deakin.edu.au.