A BIM-based approach for automated tower crane layout planning

Wang, Jun, Zhang, Xuedong, Shou, Wenchi, Wang, Xiangy, Xu, Bo, Kim, Mi Jeong and Wu, Peng 2015, A BIM-based approach for automated tower crane layout planning, Automation in construction, vol. 59, pp. 168-178, doi: 10.1016/j.autcon.2015.05.006.

Attached Files
Name Description MIMEType Size Downloads

Title A BIM-based approach for automated tower crane layout planning
Author(s) Wang, Jun
Zhang, Xuedong
Shou, Wenchi
Wang, Xiangy
Xu, Bo
Kim, Mi Jeong
Wu, Peng
Journal name Automation in construction
Volume number 59
Start page 168
End page 178
Total pages 11
Publisher Elsevier
Place of publication Amsterdam, The Netherlands
Publication date 2015-11
ISSN 0926-5805
Keyword(s) Science & Technology
Technology
Construction & Building Technology
Engineering, Civil
Engineering
Tower crane
Firefly algorithm
Building Information Modelling (BIM)
Site layout
CONSTRUCTION-SITE LAYOUT
LOCATION OPTIMIZATION
GENETIC ALGORITHMS
ERECTION PROCESSES
3D VISUALIZATION
SIMULATION
SYSTEM
SAFETY
CAD
OPERATIONS
Language eng
DOI 10.1016/j.autcon.2015.05.006
Field of Research 09 Engineering
12 Built Environment and Design
HERDC Research category C1.1 Refereed article in a scholarly journal
Copyright notice ©2015, Elsevier B.V.
Persistent URL http://hdl.handle.net/10536/DRO/DU:30120163

Connect to link resolver
 
Unless expressly stated otherwise, the copyright for items in DRO is owned by the author, with all rights reserved.

Versions
Version Filter Type
Citation counts: TR Web of Science Citation Count  Cited 27 times in TR Web of Science
Scopus Citation Count Cited 43 times in Scopus
Google Scholar Search Google Scholar
Access Statistics: 59 Abstract Views, 0 File Downloads  -  Detailed Statistics
Created: Sat, 23 Mar 2019, 16:17:38 EST

Every reasonable effort has been made to ensure that permission has been obtained for items included in DRO. If you believe that your rights have been infringed by this repository, please contact drosupport@deakin.edu.au.