Optimizing the concession period of PPP projects for fair allocation of financial risk

Jin, Hongyu, Liu, Shijing, Liu, Chunlu and Udawatta, Dona Nilupa 2019, Optimizing the concession period of PPP projects for fair allocation of financial risk, Engineering, construction and architectural management, pp. 1-17, doi: 10.1108/ECAM-05-2018-0201.

Attached Files
Name Description MIMEType Size Downloads

Title Optimizing the concession period of PPP projects for fair allocation of financial risk
Author(s) Jin, Hongyu
Liu, Shijing
Liu, ChunluORCID iD for Liu, Chunlu orcid.org/0000-0003-1144-4355
Udawatta, Dona NilupaORCID iD for Udawatta, Dona Nilupa orcid.org/0000-0002-0290-3065
Journal name Engineering, construction and architectural management
Start page 1
End page 17
Total pages 17
Publisher Emerald Publishing Limited
Place of publication Bingley, Eng.
Publication date 2019-07-05
ISSN 0969-9988
Keyword(s) Monte Carlo simulation
Concession period
Financial risk allocation
Public–private partnership
Notes In press
Language eng
DOI 10.1108/ECAM-05-2018-0201
Indigenous content off
Field of Research 0905 Civil Engineering
1202 Building
1201 Architecture
HERDC Research category C1 Refereed article in a scholarly journal
Copyright notice ©2019, Emerald Publishing Limited
Persistent URL http://hdl.handle.net/10536/DRO/DU:30128545

Connect to link resolver
 
Unless expressly stated otherwise, the copyright for items in DRO is owned by the author, with all rights reserved.

Versions
Version Filter Type
Citation counts: TR Web of Science Citation Count  Cited 0 times in TR Web of Science
Scopus Citation Count Cited 0 times in Scopus
Google Scholar Search Google Scholar
Access Statistics: 47 Abstract Views, 3 File Downloads  -  Detailed Statistics
Created: Sun, 04 Aug 2019, 11:11:06 EST

Every reasonable effort has been made to ensure that permission has been obtained for items included in DRO. If you believe that your rights have been infringed by this repository, please contact drosupport@deakin.edu.au.