Barriers to the use of integrated project delivery (IPD): a quantified model for Malaysia

Durdyev, Serdar, Hosseini, Mohammad Reza, Martek, Igor, Ismail, Syuhaida and Arashpour, Mehrdad 2019, Barriers to the use of integrated project delivery (IPD): a quantified model for Malaysia, Engineering, construction and architectural management, pp. 1-20, doi: 10.1108/ECAM-12-2018-0535.

Attached Files
Name Description MIMEType Size Downloads

Title Barriers to the use of integrated project delivery (IPD): a quantified model for Malaysia
Author(s) Durdyev, Serdar
Hosseini, Mohammad RezaORCID iD for Hosseini, Mohammad Reza orcid.org/0000-0001-8675-736X
Martek, IgorORCID iD for Martek, Igor orcid.org/0000-0001-6573-1291
Ismail, Syuhaida
Arashpour, Mehrdad
Journal name Engineering, construction and architectural management
Start page 1
End page 20
Total pages 20
Publisher Emerald Publishing Limited
Place of publication Bingley, Eng.
Publication date 2019-07-22
ISSN 0969-9988
Keyword(s) Integration
Construction
Supply chain
Notes In press
Language eng
DOI 10.1108/ECAM-12-2018-0535
Indigenous content off
Field of Research 0905 Civil Engineering
1202 Building
1201 Architecture
HERDC Research category C1 Refereed article in a scholarly journal
Copyright notice ©2019, Emerald Publishing Limited
Persistent URL http://hdl.handle.net/10536/DRO/DU:30129075

Connect to link resolver
 
Unless expressly stated otherwise, the copyright for items in DRO is owned by the author, with all rights reserved.

Versions
Version Filter Type
Citation counts: TR Web of Science Citation Count  Cited 0 times in TR Web of Science
Scopus Citation Count Cited 0 times in Scopus
Google Scholar Search Google Scholar
Access Statistics: 43 Abstract Views, 2 File Downloads  -  Detailed Statistics
Created: Thu, 22 Aug 2019, 10:01:09 EST

Every reasonable effort has been made to ensure that permission has been obtained for items included in DRO. If you believe that your rights have been infringed by this repository, please contact drosupport@deakin.edu.au.