Remnant rib pillars at Castlemaine Goldfields Ltd.’s Ballarat Gold Project have been sterilised by the placement of loose rockfill in production stopes. The application of selectively injecting low viscosity grout into the backfilled stopes to form a stabilised material has enabled recovery of the previously sterilised pillars. This paper outlines the engineering design, quality control and quality assurance program implemented to ensure the safe and efficient recovery of the rib pillars. The successful program included laboratory testing, numerical exposure stability modelling and in situ monitoring.
History
Pagination
1-18
Location
Sydney, N.S.W.
Start date
2014-11-05
End date
2014-11-06
Language
eng
Publication classification
X Not reportable, EN.1 Other conference paper
Copyright notice
2014, AusIMM
Editor/Contributor(s)
[Unknown]
Title of proceedings
AusRock 2014: Proceedings of the Third Australasian Ground Control in Mining Conference 2014
Event
International Society of Rock Mechanics. Conference (3rd : 2014 : Sydney, N.S.W.)
Publisher
AUSIMM
Place of publication
Carlton, Vic.
Series
International Society of Rock Mechanics Conference