Deakin University
Browse

Pillar recovery adjacent to stabilised rockfill at the Ballarat Gold Project

conference contribution
posted on 2014-01-01, 00:00 authored by Bre-Anne SainsburyBre-Anne Sainsbury, D Sainsbury, J Western, P Petrie, V Mutton
Remnant rib pillars at Castlemaine Goldfields Ltd.’s Ballarat Gold Project have been sterilised by the placement of loose rockfill in production stopes. The application of selectively injecting low viscosity grout into the backfilled stopes to form a stabilised material has enabled recovery of the previously sterilised pillars. This paper outlines the engineering design, quality control and quality assurance program implemented to ensure the safe and efficient recovery of the rib pillars. The successful program included laboratory testing, numerical exposure stability modelling and in situ monitoring.

History

Pagination

1-18

Location

Sydney, N.S.W.

Start date

2014-11-05

End date

2014-11-06

Language

eng

Publication classification

X Not reportable, EN.1 Other conference paper

Copyright notice

2014, AusIMM

Editor/Contributor(s)

[Unknown]

Title of proceedings

AusRock 2014: Proceedings of the Third Australasian Ground Control in Mining Conference 2014

Event

International Society of Rock Mechanics. Conference (3rd : 2014 : Sydney, N.S.W.)

Publisher

AUSIMM

Place of publication

Carlton, Vic.

Series

International Society of Rock Mechanics Conference