4D-BIM dynamic time-space conflict detection and quantification system for building construction projects
Version 2 2024-06-04, 12:09Version 2 2024-06-04, 12:09
Version 1 2018-05-23, 11:19Version 1 2018-05-23, 11:19
journal contribution
posted on 2018-07-01, 00:00 authored by A Mirzaei, Farnad NasirzadehFarnad Nasirzadeh, M Parchami Jalal, Y Zamani© 2018 American Society of Civil Engineers. Workspace in construction projects is considered a resource and a constraint that needs to be addressed in project scheduling. Without proper workspace planning, time-space conflicts frequently may occur at construction sites. In this study, a novel four-dimensional building information modeling (4D-BIM) dynamic conflict detection and quantification system was developed to identify time-space conflicts and quantify their impacts on project performance. Using the proposed approach, the conflict between different activities workspaces was identified considering the labor crew movement in the assigned workspace during different time intervals. For this purpose, four distinct execution patterns were defined, which in combination with four starting positions, led to 16 execution alternatives. The conflict's severity was then calculated through the quantitative assessment of its effects on labor productivity. To evaluate the performance of the proposed approach, it was implemented on a building project. The time-space conflicts were detected and quantified using the proposed approach. Finally, a what-if analysis was performed to select the optimum execution scenario with the minimum number of time-space conflicts. Using the proposed approach, conflict detection can be performed more accurately, and a more precise value for conflict severity is achieved.
History
Journal
Journal of Construction Engineering and ManagementVolume
144Issue
7Article number
04018056Pagination
1 - 14Publisher
American Society of Civil EngineersLocation
Reston, Va.Publisher DOI
ISSN
0733-9364Language
engPublication classification
C Journal article; C1 Refereed article in a scholarly journalCopyright notice
2018, ASCEUsage metrics
Categories
No categories selectedKeywords
Science & TechnologyTechnologyConstruction & Building TechnologyEngineering, IndustrialEngineering, CivilEngineeringConstruction projectsDynamic conflict detectionLabor productivityWorkspaceFour-dimensional (4D)Building information modeling (BIM)UTILIZING 4D VISUALIZATIONMULTISTORY BUILDINGSWORK SPACEMANAGEMENTSCHEDULECONGESTION
Licence
Exports
RefWorksRefWorks
BibTeXBibTeX
Ref. managerRef. manager
EndnoteEndnote
DataCiteDataCite
NLMNLM
DCDC