A bi-level model and hybrid heuristic algorithm for the optimal location of prefabricated building industrial park
Version 2 2024-06-03, 22:19Version 2 2024-06-03, 22:19
Version 1 2022-10-10, 00:25Version 1 2022-10-10, 00:25
journal contribution
posted on 2024-06-03, 22:19 authored by R Huang, K Li, G Liu, Asheem ShresthaAsheem Shrestha, R Chang, X TangA bi-level model and hybrid heuristic algorithm for the optimal location of prefabricated building industrial park
History
Journal
Engineering Applications of Artificial IntelligenceVolume
116Article number
ARTN 105393Pagination
1-15Location
Amsterdam, The NetherlandsISSN
0952-1976eISSN
1873-6769Language
EnglishPublication classification
C1 Refereed article in a scholarly journalPublisher
ElsevierUsage metrics
Categories
No categories selectedKeywords
ALLOCATION MODELAutomation & Control SystemsBi-level modelComputer ScienceComputer Science, Artificial IntelligenceCONSTRUCTIONEngineeringEngineering, Electrical & ElectronicEngineering, MultidisciplinaryFACILITY LOCATIONGENETIC ALGORITHMHONG-KONGIndustrial parkLocation-allocationOPTIMIZATIONPrefabricated and modular constructionScience & TechnologySITESYSTEMTechnologyTRANSPORTATIONUNCERTAINUser equilibrium
Licence
Exports
RefWorksRefWorks
BibTeXBibTeX
Ref. managerRef. manager
EndnoteEndnote
DataCiteDataCite
NLMNLM
DCDC