Version 2 2024-06-17, 19:29Version 2 2024-06-17, 19:29
Version 1 2016-06-29, 00:17Version 1 2016-06-29, 00:17
journal contribution
posted on 2014-04-08, 00:00authored byAsma Aziz, A Mto, A Stojsevski
Load frequency Control (LFC) is used for many years as part of Automatic Generation Control (AGC) in power system around the world. In a mixed power system, it is usual to find an area regulated by hydro generation interconnected to another area regulated by thermal generation or in combination of both. In the following study, performance of AGC for Thermal, Hydro and Thermal turbine based power system is examined, including how frequency bias setting influences AGC response
and inadvertent interchange. Control performance analysis of three area interconnected systems is simulated and studied through Matlab Simulink software. Integral square error and Integral time absolute error has been used as performance criterion. It is shown that integral time
absolute error (ITAE) as performance index leads to faster optimization of controller gain.