Deakin University
Browse

Electronic waste exchange for just-in-time building demolition

Download (1.12 MB)
journal contribution
posted on 2007-01-01, 00:00 authored by S Pun, Chunlu LiuChunlu Liu, Craig Langston, G Treloar
Waste exchange is as a facilitator for construction and demolition waste deduction by reuse and recycling in construction projects. The just-in-time philosophy, which has been well cultivated in the manufacturing industry, is highly adoptable for demolition projects. Particularly, waste exchange that is usually performed after the actual demolition process can be shifted forward so that waste inventory from demolition is eliminated or reduced to facilitate waste reuse and recycling. A web-based waste exchange system is an ideal platform to enable communications among project participants before a demolition project commences so that waste materials can be sold before they are produced. Therefore, the productivity of the demolition project could be improved. This research paper aims to investigate and analyse the adoption of just-in-time philosophy in building demolition project management. It also describes the development of the proposed web-based waste exchange system that implements just-in-time demolition in detail, including its functionalities, information flows and major components.

History

Journal

International journal of construction management

Volume

7

Pagination

65 - 77

Location

Hong Kong, China

Open access

  • Yes

ISSN

1562-3599

Language

eng

Publication classification

C1 Refereed article in a scholarly journal

Copyright notice

2007, Chinese Research Institute of Construction Management

Usage metrics

    Research Publications

    Categories

    No categories selected

    Exports

    RefWorks
    BibTeX
    Ref. manager
    Endnote
    DataCite
    NLM
    DC