Estimated cost at completion: Integrating risk into earned value management
Version 2 2024-06-05, 04:42Version 2 2024-06-05, 04:42
Version 1 2019-06-26, 12:40Version 1 2019-06-26, 12:40
journal contribution
posted on 2024-06-05, 04:42 authored by S Babar, Jamal ThaheemJamal Thaheem, B Ayub© 2016 American Society of Civil Engineers. Earned value management (EVM) is an industry standard for monitoring the performance of ongoing projects. The performance baseline is set up in the planning phase to measure any time and cost deviations during project execution. Based on the current progress, an estimate at completion (EAC) is forecasted. Traditionally, EVM only focuses on the project schedule (SPI) and cost (CPI), and does not address other important aspects of health and safety, stakeholder satisfaction, and quality. Despite its superior formulation, EVM forecasts are still influenced by project risks and uncertainties, leading to inconsistency between EAC results obtained through standard formulae. In order to estimate better EAC, a framework is developed that incorporates various key performance indicators into the risk performance index (RPI). Using SPI, CPI, and RPI, an integrated model is developed and a number of case studies are run to validate it. The findings indicate a better EAC when compared to traditional methods. Introducing performance indicators to measure key aspects of the project will provide the stakeholders a better monitoring and decision-making tool.
History
Journal
Journal of Construction Engineering and ManagementVolume
143Article number
ARTN 04016104Location
Reston, Va.Publisher DOI
ISSN
0733-9364eISSN
1943-7862Language
EnglishPublication classification
C1.1 Refereed article in a scholarly journalCopyright notice
2016, American Society of Civil EngineersIssue
3Publisher
ASCE-AMER SOC CIVIL ENGINEERSUsage metrics
Categories
Keywords
Science & TechnologyTechnologyConstruction & Building TechnologyEngineering, IndustrialEngineering, CivilEngineeringEarned value managementEstimate at completionProject riskRisk performance indexProject monitoring and controlCost and scheduleCRITICAL SUCCESS FACTORSCONSTRUCTION PROJECTSINDEXES3507 Strategy, management and organisational behaviour
Licence
Exports
RefWorksRefWorks
BibTeXBibTeX
Ref. managerRef. manager
EndnoteEndnote
DataCiteDataCite
NLMNLM
DCDC