The complex structure of construction project risks arises from their internal and external interactions with their dynamic nature throughout the life cycle of the project. A system dynamics (SD) approach to construction project risk management is presented, including risk analysis and response process. Owing to the imprecise and uncertain nature of risks, fuzzy logic is integrated into system dynamics modelling structure. Risk magnitudes are defined by a fuzzy logic based risk magnitude prediction system. Zadeh's extension principle and interval arithmetic is employed in the SD simulation model to present the system outcomes considering uncertainties in the magnitude of risks resulting from the risk magnitude prediction system. The performance of the proposed method is assessed by employing the method in the risk management plan of a sample project. The impact of a sample risk is quantified and efficiency of different alternative response scenarios is assessed. The proposed approach supports different stages of the risk management process considering both the systemic and uncertain nature of risks.
History
Journal
Construction management and economics
Volume
26
Pagination
1197-1212
Location
Abingdon, Eng.
ISSN
0144-6193
eISSN
1466-433X
Language
eng
Publication classification
C Journal article, C1.1 Refereed article in a scholarly journal