Methodologies of safety risk control for China's metro construction based on BIM
Version 2 2024-06-06, 06:32Version 2 2024-06-06, 06:32
Version 1 2019-03-16, 13:24Version 1 2019-03-16, 13:24
journal contribution
posted on 2024-06-06, 06:32 authored by M Li, H Yu, H Jin, P Liu© 2018 Elsevier Ltd China's metro construction accidents have occurred frequently due to the lack of effective safety risk control in the context of large-scale construction. Specifically, the safety risk control for China's metro construction mainly includes pre-construction risk identification and risk warning in construction. However, it is actually a “black box” in China. Based on Building Information Model (BIM) platform, this paper presents the Safety risk identification system (SRIS) and early warning system (SREWS) for China's metro construction. Methodologies including the modelling process, methods and key technologies for SRIS and SREWS are discussed in detail. The SRIS constructs risk identification knowledge database, designs retrieval matching algorithm and calculates the risk confidence level. The SREWS adopts data fusion, BIM and modern information technology to monitor the safety status. Discussions are drawn and the paper concludes by summarizing the main scientific contribution.
History
Journal
Safety ScienceVolume
110Pagination
418-426Location
Amsterdam, The NetherlandsPublisher DOI
ISSN
0925-7535eISSN
1879-1042Language
EnglishPublication classification
C1 Refereed article in a scholarly journalCopyright notice
2018, ElsevierIssue
Part APublisher
ELSEVIER SCIENCE BVUsage metrics
Categories
No categories selectedKeywords
Licence
Exports
RefWorksRefWorks
BibTeXBibTeX
Ref. managerRef. manager
EndnoteEndnote
DataCiteDataCite
NLMNLM
DCDC