Deakin University
Browse

Methodologies of safety risk control for China's metro construction based on BIM

Version 2 2024-06-06, 06:32
Version 1 2019-03-16, 13:24
journal contribution
posted on 2024-06-06, 06:32 authored by M Li, H Yu, H Jin, P Liu
© 2018 Elsevier Ltd China's metro construction accidents have occurred frequently due to the lack of effective safety risk control in the context of large-scale construction. Specifically, the safety risk control for China's metro construction mainly includes pre-construction risk identification and risk warning in construction. However, it is actually a “black box” in China. Based on Building Information Model (BIM) platform, this paper presents the Safety risk identification system (SRIS) and early warning system (SREWS) for China's metro construction. Methodologies including the modelling process, methods and key technologies for SRIS and SREWS are discussed in detail. The SRIS constructs risk identification knowledge database, designs retrieval matching algorithm and calculates the risk confidence level. The SREWS adopts data fusion, BIM and modern information technology to monitor the safety status. Discussions are drawn and the paper concludes by summarizing the main scientific contribution.

History

Journal

Safety Science

Volume

110

Pagination

418-426

Location

Amsterdam, The Netherlands

ISSN

0925-7535

eISSN

1879-1042

Language

English

Publication classification

C1 Refereed article in a scholarly journal

Copyright notice

2018, Elsevier

Issue

Part A

Publisher

ELSEVIER SCIENCE BV