Deakin University
Browse

File(s) under permanent embargo

Minimizing Cost Overrun in Rail Projects through 5D-BIM: A Systematic Literature Review

journal contribution
posted on 2023-05-16, 06:32 authored by Osama AI Hussain, Robert C Moehler, Stuart DC Walsh, Dominic Doe Ahiaga-DagbuiDominic Doe Ahiaga-Dagbui
Mega projects delivering rail infrastructure are constantly seeking cost-effective and efficient technologies to sustain the growing population. Building information modeling (BIM) and BIM for cost management (5D-BIM) have shown great potential in the building industry and have been adopted widely. However, 5D-BIM implementation in rail infrastructure is still in its infancy. This paper presents a systematic literature review of 380 publications related to cost overrun, cost management and 5D-BIM for rail infrastructure, including rail projects. The review identified knowledge gaps and synthesized existing research on cost overrun in rail projects, cost estimation models, and the current use of 5D-BIM. The review revealed that there is no current study integrating 5D-BIM into the rail project lifecycle. This paper highlights the importance of integrating 5D-BIM systematically in the rail project life cycle to avoid/minimize cost overrun. The review provides researchers and practitioners with crucial information for deploying 5D-BIM to minimize cost overruns in rail projects.

History

Journal

Infrastructures

Volume

8

Article number

90

Pagination

1-60

Location

Basel, Switzerland

ISSN

2412-3811

eISSN

2412-3811

Language

eng

Publication classification

C1 Refereed article in a scholarly journal

Issue

5

Publisher

MDPI

Usage metrics

    Research Publications

    Categories

    No categories selected

    Exports

    RefWorks
    BibTeX
    Ref. manager
    Endnote
    DataCite
    NLM
    DC