posted on 2006-01-01, 00:00authored byYu Lay. Langston
This thesis demonstrates a strong relationship between life cycle energy and life cycle cost based on an analysis of thirty recent Melbourne buildings. Embodied energy (initial cost) can be reliably modelled by construction cost (initial cost) and thus be readily available as early design advice, enabling more sustainable development.