This research developed two simulation methods of PDRI-SD and fuzzy-SD, by which the influence of brief clarity on design-bid-build project cost and time are predicted. Predicting the brief clarity's impact on project performance at an early stage of the project delivery aids in determining mitigation strategies for potential cost overruns and delays.
History
Pagination
169 p.
Language
English
Degree type
Doctorate
Degree name
Ph.D.
Copyright notice
All rights reserved
Editor/Contributor(s)
Farnad Nasirzadeh, Anthony Mills
Faculty
Faculty of Science, Engineering and Built Environment