Mathematical programming models for scheduling multiple cascaded waterway locks

Ji, B, Zhang, D, Yu, Shenglong and Kang, C 2021, Mathematical programming models for scheduling multiple cascaded waterway locks, Computers and industrial engineering, pp. 1-34, doi: 10.1016/j.cie.2021.107289.

Attached Files
Name Description MIMEType Size Downloads

Title Mathematical programming models for scheduling multiple cascaded waterway locks
Author(s) Ji, B
Zhang, D
Yu, ShenglongORCID iD for Yu, Shenglong orcid.org/0000-0002-2983-7344
Kang, C
Journal name Computers and industrial engineering
Article ID 107289
Start page 1
End page 34
Total pages 34
Publisher Elsevier
Place of publication Amsterdam, The Netherlands
Publication date 2021-04-01
ISSN 0360-8352
Keyword(s) lock scheduling
integer programming
job shop scheduling
multi-flow network
Notes Pre-proof
Language eng
DOI 10.1016/j.cie.2021.107289
Indigenous content off
Field of Research 01 Mathematical Sciences
08 Information and Computing Sciences
09 Engineering
HERDC Research category C1 Refereed article in a scholarly journal
Persistent URL http://hdl.handle.net/10536/DRO/DU:30149732

Connect to link resolver
 
Unless expressly stated otherwise, the copyright for items in DRO is owned by the author, with all rights reserved.

Versions
Version Filter Type
Citation counts: TR Web of Science Citation Count  Cited 0 times in TR Web of Science
Scopus Citation Count Cited 0 times in Scopus
Google Scholar Search Google Scholar
Access Statistics: 26 Abstract Views, 2 File Downloads  -  Detailed Statistics
Created: Tue, 06 Apr 2021, 08:44:02 EST

Every reasonable effort has been made to ensure that permission has been obtained for items included in DRO. If you believe that your rights have been infringed by this repository, please contact drosupport@deakin.edu.au.